跨真实法定假日数工作日
在中国或美国的带日期假日表上加减工作日,计入调休上班的周末,并列出每一个被跳过的假日。
假日表覆盖 2025–2027;表外年份照常数周末,并在输出里明确说明。
在本标签页内运行,不上传任何内容。
结果
免费档:不需要文件,每次 1 个输入,每天 10 次。这件工具单件买断 $24,一次付款。对比价格。
授权:免费档。
这页与别处不同之处
大多数工作日计算器数完周末就结束,所以区间里一旦落进法定假日,答案就是错的。这个页面内置中国大陆和美国的带日期假日表,承认中国的调休上班周末,并打印跳过的日期,让计数可以手工复核。它回答三个问题:某天之后第 N 个工作日是哪天、某截止日之前第 N 个工作日是哪天、两天之间有多少个工作日。
按中国与美国带日期的假日表数工作日,计入调休上班日,并逐条列出跳过的假日。
示例输入与输出
| 环节 | 情形 | 体积 | 说明 |
|---|---|---|---|
| 输入 | One calculation request | 175 B | ten working days after 2026-02-09 in China, with the Spring Festival inside the range |
| 输出 | A dated, checkable answer | 593 B | result date, weekday, the holidays skipped, the table version and its source URL |
这里写的是本页构建时对照的演示数字,不是对每个文件的承诺。
你可以自己核对什么
| 承诺 | 测试结果 |
|---|---|
| a public holiday inside the range moves the result by one day, and is named | unit test walks 2026-02-09 forward ten working days with the CN table and asserts the result plus every skipped holiday date |
| counting backwards is the inverse of counting forwards | property test asserts backward(forward(x, n), n) returns x for n from 0 to 40 on both weekend masks |
| a year without holiday data is called out instead of silently ignored | unit test asks for a range beyond the table and asserts the output contains a missing-data note for those years |
常见问题
以下问答目前仍为英文原文。
Which countries have holiday data, and how current is it?
Mainland China and the United States, covering 2025 to 2027. Each table names the official notice it was transcribed from and the date it was checked. Years outside that window still count weekends, and the output says so plainly instead of guessing.
Does the Chinese table count the make-up working weekends?
Yes. The State Council moves some weekends to working days around long holidays; those dates are in the table and count as working days even though they fall on a Saturday or Sunday. The output names them where they matter.
What counts as a weekend?
Saturday and Sunday by default, with a Friday and Saturday option for the Gulf and Israel. Holidays always take precedence over a weekend, and a make-up working day takes precedence over both.
Can I add company shutdown days?
Yes. Enter them in the extra holidays field, one per line or comma separated, and they are skipped exactly like public holidays. They stay in your browser; nothing is uploaded.
Is the anchor day counted?
Only if you say so. By default ten working days after Monday is two weeks later, because the Monday itself is day zero. Switch the include option on when a contract says the first day counts.
价格
这件工具一次性 $24,只要工具还在就一直可用。一次付款,不是订阅。授权存在当前浏览器里,凭交易号可在别处恢复。
免费档:每天 10 次。买断:不限每天次数。其余不变——这页每次只处理一个输入。